Gold Standard Builders, Inc.
Gold is Our Standard.
PROPOSAL No. GSB-2026-0461
PREPARED FOR Jordan Miller
1450 Vista Court
Los Angeles, CA 90041
CSLB LIC. #1033117

Dear Jordan,

Thank you for having me into your home in Eagle Rock. It was a real pleasure to walk the space with you and to picture, together, what your bathroom and floors can become.

I want to put everything we discussed in writing — plainly, with nothing hidden. Below is the full scope of work for both projects, the price set out like a ledger so you can see exactly where every dollar goes, and a monthly option in case you'd rather not pay it all at once. No fine print, no surprises. Just our handshake, written down.

We're a family business. When you hire us, you get me — Adam — on the job and on the phone. The same name on this letter is the same name on the permit and the warranty.

Take your time with it. Read it at the kitchen table. When you're ready, you can sign right at the bottom of this page, and I'll take care of the rest.

Project 01 / Scope of Work

Bathroom Remodel — Steam Shower

Every line below is included in the price. Done to code, done once, done right.

The full scope, in order

Est. 4 – 4.5 weeks
  • 01Protect and contain the work area to keep dust out of the rest of your home.
  • 02Demolition of the existing bathroom.
  • 03Haul away and dispose of all debris.
  • 04Rough plumbing modifications for the new layout.
  • 05Rough electrical modifications for the new layout.
  • 06Build and fully waterproof the steam shower enclosure to code.
  • 07Install the steam system and its controls.
  • 08Install backer board and substrate, prepped for tile.
  • 09Set porcelain wall and floor tile.
  • 10Install mosaic accents and a recessed shower niche.
  • 11Install a frameless glass shower door, run to the ceiling.
  • 12Install your double vanity and countertop (owner-provided).
  • 13Install your faucets, fixtures and trim (owner-provided).
  • 14Install LED lighting throughout.
  • 15Install an exhaust fan vented to the exterior.
  • 16Install GFCI outlets to code.
  • 17Patch, prep and paint.
  • 18Final clean and a walkthrough together.
A note on your finishes

For the vanity, countertop, faucets, fixtures and trim, you choose and supply the products you love — and we install them with care. You stay in full control of the look and the budget on those pieces, and there's no markup hiding in our number for them.

Optional upgrade — curb-less, zero-threshold steam shower (a clean, modern, walk-straight-in entry) +$2,500
Bathroom remodel — steam shower 18-item scope above · ~4–4.5 weeks · labor & installation $28,900
Project 02 / Scope of Work

New Flooring Throughout

Roughly 2,800 square feet, brought up to a single, even, beautiful floor.

The full scope, in order

Est. 2.5 – 3 weeks · ~2,800 SF
  • 01Remove the old vinyl flooring and haul it away.
  • 02Prep and level the subfloor for a flat, quiet finished floor.
  • 03Supply and install engineered wood flooring throughout.
  • 04Fabricate and install 14 custom stair noses.
  • 05Install new MDF baseboards.
  • 06Caulk, prep and paint.
  • 07Final clean and a walkthrough together.
Your material allowance

The price includes a $5.50 per square foot allowance for the engineered wood itself. Pick a richer plank and you simply pay the difference; pick something more modest and we credit the savings straight back to you. Either way, you see the number, and the choice is yours.

New flooring throughout ~2,800 SF · $5.50/SF material allowance · 14 stair noses · ~2.5–3 weeks $37,750
The Ledger / Your Investment

The whole job, in plain numbers

Two projects, one total — added up for you below.

Bathroom remodel — steam shower Project 01 $28,900
New flooring throughout Project 02 $37,750
Total Investment $66,650
Financing / A monthly path
$640 / month, estimated

Most of our clients prefer to spread a project like this over comfortable monthly payments rather than write one large check. We can help you arrange that.

  • Roll it into your mortgage.
  • Unsecured home-improvement loans — with no penalty for paying off early.
  • All major credit cards accepted.

*Estimated — actual terms subject to credit approval.

Payment Schedule / Staged by Milestone

You pay as the work earns it

DEP Deposit to reserve your start date $1,000
M1 At demolition & rough-in complete by milestone
M2 At waterproofing & substrate complete by milestone
M3 At tile, flooring & finish installation by milestone
FIN Final balance at walkthrough & your sign-off by milestone

Your deposit is just $1,000 — by California law a home-improvement deposit can be no more than 10% of the job or $1,000, whichever is less. We hold ourselves to that gladly. You never pay for work we haven't done.

Standing Behind the Work / Credentials

Licensed, bonded, insured — and accountable to you

License CA Contractor License #1033117 — verifiable on the CSLB website.
Coverage Licensed, Bonded & Insured to $2,000,000.
Office 800-469-9189
Office 15021 Ventura Blvd., Sherman Oaks, CA 91403

Our written workmanship warranty: every part of this job is guaranteed against defects in our workmanship for two full years from completion — if something isn't right, we come back and make it right, at no cost to you.

Recent Work / Selected Plates

A few rooms we've built lately

Real projects from homes across the Eastside and the Valley.

In Their Words / Neighbors

From homeowners we've worked for

Adam walked our whole project with us before a single thing was torn out, and the price he wrote down was the price we paid. Our steam shower is the best part of the house now. — Dana & Rob M., Eagle Rock, CA  ·  placeholder
They put down 2,000 square feet of floor and left the place cleaner than they found it. You can tell it's a family business — they actually care. — Priya S., Highland Park, CA  ·  placeholder

It would be an honor to build this for you and your family.

Adam Cornfeld
Owner · Gold Standard Builders, Inc.
Acceptance / Your Signature

When you're ready to move forward, type your full name below as your signature, then press Accept. It opens a pre-filled email straight to Adam — that's all it takes to reserve your start date.

ACCEPTING — Bathroom & Flooring · 1450 Vista Court, Los Angeles, CA 90041
TOTAL INVESTMENT — $66,650
Opens a pre-filled email to Adam. Nothing is sent until you press send.